Direct cost mix
Buildings · Sitework · Fire water (selected scenario)
Low / Mid / High range
All-in project budget (construction + soft costs)
Building packages
Click a package to open Buildings
Project info
From Excel cover sheet
Edit blue cells — the full rollup recalculates instantly (GC, fee, contingency, escalation, bond, insurance, and owner soft costs). Values match Excel sheet 02_Assumptions.
Markups & construction drivers
Applied on the project rollup cascade
Owner soft costs
A/E, contingency, and lump-sum allowances
Live impact preview
Mid construction & all-in after current rates
Direct (unloaded) building & system costs. Toggle Include to zero a line. Edit qty and unit rates (blue). Markups apply on the Project Rollup.
Bottom-up civil quantities (reconciled). Unit rates are currently zero in the source workbook — enter rates here to price sitework. Campus model previously used ~18% of building cost as a factor.
Fire protection water supply — NFPA 20 / 22 component build-up (pump, tank, yard loop). Major swing item pending hydrant flow test.
Sizing calculator for 20+ large trucks. Planning SF (rounded) can be applied to BLDG 6 quantities. Costs below are the canopy package direct costs from Buildings.
Sizing inputs
Blue cells drive canopy SF
Calculated geometry
Feeds BLDG 6 line quantities
Full project rollup cascade. Markup rates link to Assumptions; direct costs flow from Buildings, Sitework, and Fire Water.
Cost waterfall
Low · Mid · High in parallel
Construction build-up
Share of total construction (mid)
Soft cost breakdown
Owner soft costs (mid)
Decisions that tighten this estimate. Update status as items are resolved — progress is saved in this browser.